Coastal Road (Mumbai)
Freeway in Mumbai, Maharashtra, India
Coastal Road (Mumbai) ▸ Facts ▸ Comments ▸ News ▸ Videos
Dharmveer Swarajya Rakshak Chhatrapati Sambhaji Maharaj Coastal Road is a partially opened 8-lane, 29.2-km long grade separated expressway along Mumbai's western coastline connecting Marine Lines in the south to Kandivali in the north. It is projected to be used by 130,000 vehicles daily, and is expected to reduce travel time between South Mumbai and the Western Suburbs from 2 hours to only 40 minutes. The estimated cost of the project is ₹13,060 crore (US$1.6 billion). Its first phase, which is inaugurated on 11 March 2024, is a 10.58 km section from Princess Street flyover to the Worli end of the Bandra–Worli Sea Link.
0 shares | ShareTweetSavePostSend |
You Might Like
X war between Sena (UBT) and BJP after Bachchan's post about Coastal RoadBJP and Shiv Sena clash over Coastal Road project. Amitabh Bachchan praises it, while Sena criticizes BJP for delays. Aaditya Thackeray accuses BJP of taking credit for work not done by itself.IndiaTimes - Published | |
Mumbai Coastal Road inaugurated today: Check reduced travel time, entry rules, speed limits and moreAs of now, the south bound corridor of the costal road between Worli and Marine Drive would be made operational.DNA - Published | |
NGT recalls Aug '22 order over Mumbai Coastal Road noise levels passed without hearing HCCThe August 2022 order by NGT was in an application filed by a south Mumbai resident Dileep Nevatia who had sought orders to direct the government and civic administration to “maintain air and noise..IndiaTimes - Published | |
Search this site and the web: |