India  

Gujarat: First 100m Span Of 2 X 100m Long Steel Bridge Launched Over NH-48 For Bullet Train Project

Zee News Saturday, 26 April 2025
The first span of the bridge was launched on the highway across the three lanes by sliding the span for about 200 m from one end. 
0
shares
ShareTweetSavePostSend
 

You Might Like


Related videos from verified sources

Putin Drops ‘Territory Ultimatum’—Ukraine Hits 5 Russian Bases | U.S. Confronts Kremlin in Istanbul [Video]

Putin Drops ‘Territory Ultimatum’—Ukraine Hits 5 Russian Bases | U.S. Confronts Kremlin in Istanbul

As Russia unveils its bold “Istanbul-22 Plus Territory” plan—demanding Ukraine cut all military ties with the West—Ukraine strikes back, launching coordinated drone attacks on five major..

Credit: Oneindia     Duration: 04:13Published
Moment of Ukrainian Attack On Russian Airbases Caught on Camera | 40+ Aircraft Destroyed [Video]

Moment of Ukrainian Attack On Russian Airbases Caught on Camera | 40+ Aircraft Destroyed

Ukraine launched a dramatic long-range drone strike deep into Russian territory, targeting multiple airbases in a surprise special operation. At least 40 Russian aircraft, including strategic bombers..

Credit: Oneindia     Duration: 03:35Published
‘Drone Launch Site Destroyed…’ Russia’s First Reaction After Ukrainian Drone Strike  | Siberia [Video]

‘Drone Launch Site Destroyed…’ Russia’s First Reaction After Ukrainian Drone Strike | Siberia

Hours after Ukrainian drones struck deep into Russian territory, destroying over 40 aircraft, Russia responded. Irkutsk region governor Igor Kobzev confirmed that the source of the Ukrainian drone..

Credit: Oneindia     Duration: 03:39Published