India  

Ram Mandir construction to be completed by June 5: Nripendra Mishra

Mid-Day Tuesday, 29 April 2025 ()
Ram Mandir construction to be completed by June 5: Nripendra MishraThe `Garbhagriha`, where Ram Lalla is enshrined, had already been completed earlier. However, the first and second floors and the shikhar (main spire) above were still under construction. On Tuesday, the Dhwajdand (temple flagpole) was installed atop the shikhar
0
shares
ShareTweetSavePostSend
 

You Might Like


Related videos from verified sources

Trump Disrupts Easter Prayer Service with Bizarre Entrance — Arrives 30 Min. Late, Interrupts Speech [Video]

Trump Disrupts Easter Prayer Service with Bizarre Entrance — Arrives 30 Min. Late, Interrupts Speech

Things got awkward fast at the White House Easter Prayer Service when President Donald Trump arrived nearly 30 minutes late — and then interrupted a live performance in what many are calling a..

Credit: Oneindia     Duration: 03:07Published