Kalwa car shed barricaded as Central Railway pushes wall, FOB construction
Saturday, 3 May 2025 CR move to prevent locals from boarding starting trains at car shed that was leading to packed trains rolling into Thane station; the plan is to build an FOB linked to the existing bridge at the Chhatrapati Shivaji Maharaj Terminus (CSMT) end of the station