India  

Mumbai: City’s first cable-stayed railway overbridge inaugurated at Reay Road

Mid-Day Wednesday, 14 May 2025
Mumbai: City’s first cable-stayed railway overbridge inaugurated at Reay RoadCity’s first cable-stayed bridge to improve road safety, alleviate traffic congestion in the area; the new bridge which connects Reay Road East to Read Road West has six lanes, and is 385 metres long, including its arms
0
shares
ShareTweetSavePostSend
 

You Might Like


Related videos from verified sources

RML Group P39 prototype at Supercar Fest 2025 [Video]

RML Group P39 prototype at Supercar Fest 2025

RML Group, the British engineering firm renowned for four decades of motorsport and engineering innovation, wowed spectators at Supercar Fest The Runway 2025 with the first public appearance of its..

Credit: AutoMotions     Duration: 00:27Published
Mercedes-Benz eActros 600 - 2025 Winter Testing [Video]

Mercedes-Benz eActros 600 - 2025 Winter Testing

Mercedes-Benz Trucks has once again sent its two near-production prototypes of the eActros 600 on a testing tour through Northern Europe – but this time during the cold season in sometimes very..

Credit: AutoMotions     Duration: 02:06Published
2025 Toyota Hilux GR Sport II Design Preview [Video]

2025 Toyota Hilux GR Sport II Design Preview

Over 55 years, the Toyota Hilux has earned an unparalleled reputation. It demonstrates its strength and reliability day after day, all over the world: on any terrain and in the most challenging..

Credit: AutoMotions     Duration: 02:45Published

Related news from verified sources

Mumbai’s first cable-stayed Reay Road bridge to be inaugurated on May 13

Reay Road bridge is city’s first cable-stayed road overbridge and has been one of the fastest to be completed, as the older one was demolished in February 2022...
Mid-Day