India  

Mumbai: Dust trail from Andheri construction site chokes Lokhandwala stretch

Mid-Day Wednesday, 2 July 2025 ()
The Lokhandwala Complex Environment Action Group first raised the issue with the BMC in September 2024, reporting that five to six trucks leave the site daily with wheels caked in wet soil. This soil is deposited along the road by the trucks
0
shares
ShareTweetSavePostSend
 

You Might Like