Mumbai: Central Railway to operate mega block on April 14, check details
Saturday, 13 April 2024
On the main line, the mega block will be conducted from 11.00 am to 4.00 pm on Up and Down slow lines between Thane and Kalyan stations
On the main line, the mega block will be conducted from 11.00 am to 4.00 pm on Up and Down slow lines between Thane and Kalyan stations
|
||||
You Might LikeRelated news from verified sources
|